Cambridge Saddle Glaze - Quick Ship
Ships in 3-7 business days
Accident Protection Warranty For Your Entire Kitchen! Learn More!
The Cambridge Saddle Glaze cabinets will enhance the look of any kitchen with it's timeless design. It's full overlay and raised panel door make it a great addition to any home. Featuring solid birch mitered doors and a 1/2" plywood box, these cabinets are sure to stand the test of time.
| Shipping Time: | Part of our Quick Ship program - ships in 3-7 business days |
| Style: | Raised Square |
| Face Frame: | 3/4" x 1-3/4" Birch |
| Door Frame: | Premium HDF (HDF is used to avoid cracking/warping) |
| Door Center: | Premium HDF (HDF is used to avoid cracking/warping) |
| Sides: | 1/2" A-GradePlywood |
| Top & Bottom (Wall): | 1/2" A-GradePlywood |
| Bottom (Base): | 1/2" A-GradePlywood |
| Back Panel: | 1/2" A-GradePlywood Full Back |
| Shelves: | Adjustable 3/4" w/Front Edge Banding |
| Base Cabinet Shelf Depth: | 1/2 |
| Drawer Box: | 5/8" solid hardwood, dovetailed drawer box, 5/16" Plywood Drawer Box Bottom, 5-Piece drawer front construction |
| Drawer Glides: | Undermount, Full Extension, Soft Close Glides |
| Base Corner Supports: | 3/4" Solid Wood Corner Blocks |
| Overlay: | Full |
| Hinges: | 6-way Adjustable, Concealed, European Soft Close Hinges |
| Cabinet Interior: | UV Coated Natural Interior(Prepped-for-glass cabinets will be finished to match the cabinet fronts) |
| Center Stile: |
None (unless listed in the cabinet description) |
| Assembly Method: | Metal Clip or Glue & Staple: Cabinets come with Metal Clips (Cleats - not already installed on the cabinets) that can be used to assemble or the cabinets can be Glued and Stapled. If Staple & Glued, clips will not be used |
| Finish: | 7 step, acid-catalyzed finish process with a UV coating and brushed glaze |
| Toe Kick: | 1/2" Plywood |
| Installation Rail: | None |
| Wall Cabinet Bottoms Finished (Exterior): | Yes (just bottom panel, edges of side and back panel and recessed area is unfinished) |
| CARB Compliant: | Yes |
| Door Hinges: | Doors come pre-drilled for the hinges, the face frame has marks where to drill and the customer chooses Right or Left during assembly. |
| Toe Kicks Included w/Base Cabinets: | Yes, but there will be a small gap when two cabinets are side by side, so the TKC (8' toe kick) is needed if cabinets are next to each other. |
| Sides Panels Finished: | Yes |
| Installation/Design Note: |
The cabinet depth measurement listed is the depth from the front of the face frame to the back of the cabinet, and does not include the cabinet door depth. Schematic images and renderings are generic and may not represent exact construction details for each collection. The exact specifications for this collection can be found in the construction details listed above. |
The order process was simple, however award points , not easy to use. I tried to apply them to a second order for some additional moldings and was unable to do so. As to cabinets, they are beautiful and look awesome in our master bath. Assembly is relatively simple as well. I am mechanically inclined and a retired contractor, but anyone with a little dexterity can assemble these cabinets!
My whole experience with RTA Cabinets was excellent. The cabinets are quality and easy to put together. RTA was there when I needed anything. I’ve made several purchases with them including a whole kitchen, 168”entertainment area, and coffee bar.
Order and service was great. RTA helped as every step of the way. Assembly and installation was easy. They look great. Thank you RTA.

Login and Registration Form